Multi-Unit Buildouts

One number to call for forty locations.

New construction, franchise rollouts, retail chains, medical groups, and multi-tenant properties. We own the technology scope from the drawings through the day the last site goes live.

  • 1 project manager across every trade and carrier
  • 90–180 d typical carrier interval we plan around, not react to
  • 100% of sites documented and handed over as-built

Sound familiar?

What we keep walking into

If any of these describe your situation, the fix is usually cheaper and faster than you have been told.

Every location was built by a different contractor, so nothing is standard and nothing is documented.

Circuits were ordered late, so the store is built and sitting dark waiting on the carrier.

The GC, the low-voltage sub, the POS vendor, and the carrier all point at each other.

Nobody owns the technology schedule, so it becomes the critical path by accident.

What you get

Scoped properly, priced across the market, managed to go-live.

  • A single standardized site template — circuit, firewall, switching, wireless, voice, POS, cabling — replicated across every location.
  • Circuit ordering sequenced against the construction schedule so carrier intervals stop being the critical path.
  • One project manager coordinating carriers, low-voltage, POS, and your GC.
  • Site survey and as-built documentation for every location, delivered to you, not held hostage.
  • Centralized billing and a single escalation path once you are live.

Who we quote for this

Connectivity

Lumen AT&T ACC Business Verizon Spectrum Enterprise Comcast Business Cox Business Zayo Cogent Crown Castle Frontier Uniti Solutions Metronet FirstLight +18 more

Low Voltage

CommScope Panduit Leviton Corning Ubiquiti Cisco Meraki Axis Communications Verkada Avigilon Openpath

SD-WAN & SASE

Cato Networks Aryaka Bigleaf Fortinet Cisco Meraki Versa VMware VeloCloud CommandLink Expereo Mosaic NetworX Netrio APX Net

POS & Payments

Clover Toast Square SpotOn Lightspeed talech Shift4 Allegiance Merchant Services Fiserv Global Payments

Named, because an unnamed logo carousel tells you nothing.

Questions

Before you ask us

When should we bring you in?

At drawings. The single most expensive mistake in a multi-site rollout is ordering circuits after the walls are up. Carrier intervals run 90 to 180 days and construction does not wait.

Do you do the physical install?

We manage it. Cabling and rack work is performed by vetted low-voltage partners under our scope and our schedule, which means one accountable party instead of four.

How many locations is worth it?

Three or more and the standardization pays for itself immediately. Under three it is still worth a conversation, especially if you plan to grow.

Get a real comparison

Three questions. Forty-eight hours. No cost.

You will not get a generic brochure back. You will get the providers who actually serve your address, priced side by side, with install intervals and any construction cost disclosed up front.

What do you need?

Pick everything that applies.

Where, and how big?

This is what lets us check which carriers actually reach you.

A full address gets you a serviceability answer instead of a range.

How many locations?
When do you need it live?
Where do we send it?

One person reads this. No list, no drip, no sales floor.

Rather just talk to someone? (919) 444-4422

Find out what you should actually be paying.

Send one recent invoice and we will read every line — what each charge does, what is retiring, what is renewable, and what the market rate is. No meeting required to get it, and no cost at any point.

Call now Free audit